论文部分内容阅读
第一重型机器厂于1987年11月同联帮德国西马克公司合作成功地制造了2050mm热带钢连轧机,经过联帮德国专家、宝山钢铁总厂和一重厂三方联合检验,全部达到了联帮德国标准。 2050mm热带钢连轧机,是上海宝山装铁总厂二期工程的重点设备,属于国务院直接领导研制的十二项重大技术装备之一。该轧机占宝钢二期工程总投资的四分之一左右,投产后每年可为国家提供四百万吨热轧带钢。2050mm热连轧机轧制的钢板厚度为1.2-25.4毫米,宽度为600-1900
The first heavy machinery factory in November 1987 with the joint cooperation with the German company SMS successfully produced 2050mm hot strip mill, the joint help German experts, Baoshan Iron and Steel Plant and a heavy factory tripartite joint inspection, all reached the joint help German standard The 2050mm hot strip mill is the key equipment of the second phase of Shanghai Baoshan Iron & Steel Works and belongs to one of the 12 major technical equipments directly under the leadership of the State Council. The mill accounts for about a quarter of the total investment of Baosteel Phase II Project and can provide 4 million tons of hot-rolled steel strip to the country every year after put into production. 2050mm hot rolling mill rolled steel thickness of 1.2-25.4 mm, a width of 600-1900