新型河渠流量测验浮标浅谈

来源 :河南水利 | 被引量 : 0次 | 上传用户:xkt376
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1 浮标在流量测验中的作用《水文测验规范》规定,浮标法流量测验是水文测验的基本方法之一。在山区,由于水流涨落较快,其流速较大,其它测流手段一般无法正常实施,浮标成了流量施测的主要方法。即使是在平原河道,如果出现特大洪水超出了水文缆道的测流设计能力,水文缆道无法使用,也必须使用浮标法施测流量。另外,在水文缆道出现故障无法正常使用时,浮标测流也是一种行之 1 buoy role in the flow test “Hydrological test specification” provides that the buoy method flow test hydrological test is one of the basic methods. In mountainous areas, because of the rapid fluctuation of water flow and its large flow rate, other means of flow measurement are generally unable to be implemented normally. The buoy has become the main method of flow measurement. Even in plain rivers, if a catastrophic flood occurs beyond the hydrographic cable’s hydrodynamic design capability, the hydrological cableway can not be used and the buoy method must be used to measure the flow rate. In addition, in the hydrological cable fault can not be used normally, the buoy current measurement is also a
其他文献
1 概述本工程为平顶山师范高等专科学校扩建工程自备水厂取水口部分。主要有挡水围堰的修建,取水口的开挖,基坑护筑,拦污钢网制作安装,泵船安装,引水渠修建,以及围堰的拆除,
1.《科技潮》1993,no.1—索刊号:50/KJ12.32.《贵州科学》1992,v. 10,no.3—索刊号:50/G41.33.《云南环境科学》1992,v.11,no.1—索刊号:50/Y964.《中国人口、资源与环境》1
冲破“传统服务不能收费”的禁区,是图书馆深化改革的关键和突破口。所谓传统服务,就是指图书馆对读者提供文献的外借、阅览和一般咨询服务,实 Breaking the forbidden zon
为了早日实现华北山区、丘陵、平原旱作地区农业机械化,根据一机部的安排,在河北、山西省机械局组织领导下,由河北保定农机厂、山西雁北地区机械厂、山西原平县农机修造厂、
近来国内外剖宫产(CS)率普遍升高,瘢痕子宫再次妊娠分娩的处理,已成为产科高危妊娠中较为突出的问题。我们收集本院1975年1月~1988年6月前次CS后再妊娠临产的70例临床资料作
紫坪铺电站水头变幅大,并主要担任系统调峰、调频任务,这就需要对水轮机的各项性能进行认真研究、分析,了解水轮机模型的性能特点,针对这些特点指导机组的调度和运行,以求机
随着改革开放的发展,高校教育必须尽快与市场经济接轨,因此,我院每年的招生计划及开设专业都有所调整。为使最新政策、市场动向、新的知识和科技信息尽快地、系统地与读者见
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
《高校图书馆工作》创刊十周年了,对一个人来说十岁还是幼年,对一项事业来说十年可创立丰功伟绩。湘省高等学校图书情报界的同行们,在这十年里,坚持从国情省情出发,既脚踏实
11月5日,江苏省副省长张怀西在常熟市政府领导的陪同下,视察了常熟市图书馆。张副省长一下车,看到新建的少儿馆就兴致勃勃地说:“先看少儿馆,这样漂亮的少儿馆全省不多。”