论文部分内容阅读
葛洲坝股份有限公司与保康县水电开发建设有限公司共同组建湖北南河水电开发有限公司,负责过渡湾电站及南河流域后续水力资源的开发。合资双方按照平等互利、协商一致的原则,就过渡湾电站的建设管理体制、项目资本金、预期收益率和超预期收益处理以及后续施工管理等问题达成共识。通过过渡湾电站建设及投资决策,对水电项目开发的启示是:对基础设施建设在政策上要优惠,社会效益要进行投资分摊,要进行流域梯级开发。
Gezhouba Co., Ltd. and Baokang County Hydropower Development and Construction Co., Ltd. jointly established Hubei Nanhe Hydropower Development Co., Ltd., responsible for the development of the transitional power station and the follow-up hydraulic resources of Nanhe River Basin. Based on the principles of equality, mutual benefit and consensus, the joint ventures reached consensus on the construction management system, capital of the project, expected rate of return and excess expected return of the transitional power station construction and follow-up construction management. Through the construction of transitional station and investment decision-making, the enlightenment to the development of hydropower projects is that it is necessary to preferential policies on infrastructure construction, social benefits should be invested and assessed, and cascade development of the watershed should be carried out.