论文部分内容阅读
双台子河闸枢纽工程投入运行以来,为盘锦市的开发建设发挥了极其重要的作用。多年来双台子河闸一直处于高水位运行,又常遇到辽河枯水期,因而造成河道淤积严重,降低了深孔闸的泄洪能力,各建筑物都必须加高或改建。文章通过对河闸工程金属结构、电气设备等要素进行分析,为以后类似的工程施工积累经验和提供技术参考。
Since the project of Shuangtaizihe River sluice has been put into operation, it has played an extremely important role in the development and construction of Panjin City. Shuangtaizi River sluice has been operating at high water level for many years and often encounters the Liaohe River dry season. As a result, siltation of the riverway is serious and flood discharge capacity of the deep-hole sluice is reduced. All buildings must be raised or rebuilt. Through analyzing the metal structure and electrical equipment of Hezha project, the article has accumulated experience and provided technical reference for similar construction in the future.