1987年9月28日水利电力部委托湖北省电力局组织召开了“水电站优化运行控制系统及其装置”技术鉴定会。会议代表共29人。其中高级职称16名。代表们通过评审。一致认为: 1.该系统是对中、小型水电站实施优化运行的微机闭环控制系统。能实现水电站优化运行自动控制。有增发水电量3%左右的经济效益;
September 28, 1987 Ministry of Water Resources commissioned Hubei Provincial Power Bureau organized a “hydropower station optimal operation control system and its installation” technical appraisal. A total of 29 conference delegates. Including 16 senior titles. The delegates passed the assessment. It is agreed that: 1. This system is a microcomputer closed-loop control system for optimizing the operation of medium and small hydropower stations. Hydropower station can achieve optimal operation of automatic control. There are additional economic benefits of about 3% hydropower;