论文部分内容阅读
介绍了田集发电厂2台600 MW机组概况,分析1号锅炉分隔屏过热器超温爆管的原因,阐述了所采取的针对性运行调整措施及实施结果。
This paper introduces the general situation of two 600 MW units in Tianji Power Plant, analyzes the reason of overheating squirting of the superheater in No.1 boiler and expounds the corrective measures and results of the targeted operation.