论文部分内容阅读
行包办理站的优化是一种基于全路车站行包办理量统计分析的优化方法,是解决多因素条件影响下铁路行包办理站址选择的依据。根据全路铁路行包办理站办理量及旅客列车加挂行李车编挂方案,按照始发终到、中途及中转车站作业情况,采用分析的方法给出了行包办理站设置的原则,并在此基础上得出未来行包办理站的优化方案。方案的执行可行性强,灵活且有针对性,对未来行包办理站的发展具有指导性意义。
The optimization of the line package management station is an optimization method based on statistical analysis of the line package management of the whole station, and is the basis for selecting the site selection of the railway line package under the influence of the multi-factor conditions. According to the whole line of railway package handling station handling capacity and passenger trains plus hanging luggage carts hanging plan, according to the originating to the end, halfway and transit station operations, using the method of analysis given the principle of package handling station set On the basis of this, we can draw the optimization plan for the future luggage handling station. The implementation of the program is feasible, flexible and targeted, and is of guiding significance to the future development of the luggage handling station.