苏联第十一个五年计划中煤炭矿山掘进技术装备水平大大提高,掘进机总数增加了11%,截至1984年1月1日共有2074台;装载机增加19%(5094台);打眼设备增加12%(1319台)。其中最有效的ΓΠΚC轻型掘进机,由占总数的50.9%增至59.1%,中型4ΠΠ-2型掘进机由8.3%增至11.5%。生产能力最高的ΠΗΒ-2型装载机保持在原来水平(37~38%)。1984年初矿山准备工程中机械化装
In the 11th Five-Year Plan of the Soviet Union, the level of coal mine tunneling technology and equipment greatly increased. The total number of roadheaders increased by 11%. As of January 1, 1984, a total of 2074 units were installed. Loaders increased by 19% (5,094 units) 12% (1319 units). Among them, the most effective ΓΠΚC light roadheader increased from 50.9% of the total number to 59.1%, while the medium-sized 4ΠΠ-2 roadheader increased from 8.3% to 11.5%. The ΠΗΒ-2 loader with the highest production capacity remains at its original level (37-38%). In early 1984, the mine was ready for mechanization