裴沟煤矿是1966年投产,原设计生产能力为60万t/a,历经1979年和2001年2次改扩建,现矿井生产能力达到205万 t/a 以上,原煤运输采用架线式电机车牵引,2007年10月被拟定为煤与瓦斯突出矿井后,改用湖南双马电气有限公司生产的 CTL8/6-110型蓄电池电瓶车牵引,为此设计并施工了井下充电硐室。1 充电硐室及相关巷道布置1.1 充电硐室巷道布置按照《煤矿安全规程》的有关规定:井下充电室必
Pei Gou mine was put into operation in 1966, the original design production capacity of 60 million t / a, after 1979 and 2001, two expansion and expansion, the mine production capacity has now reached 2.05 million t / a, coal transportation using overhead electric locomotive Traction, in October 2007 was drafted as coal and gas outburst mine, switch to the dual horse Electric Co., Ltd. Hunan CTL8 / 6-110 battery traction battery car, for which the design and construction of the underground charge chamber. 1 charge chamber and related roadway layout 1.1 charge chamber tunnel layout in accordance with “Coal Mine Safety Regulations” of the relevant provisions: underground charging room will be