论文部分内容阅读
一、概况隔河寨三级水电站,位于河北省北部山区燕山脚下,赤城县城以南40km的红河、白河的汇流处。该电站主要枢纽工程由干砌石钢筋笼硬壳引水溢流坝(坝高4m、宽7.5m、长173m)、进水闸(3m×3m平板钢式闸门)、冲沙闸(5m×5m平板钢闸门)、矩形圆拱式引水隧洞(洞长201m、高3m、宽3m)等建筑物组成(见下图)。电站安装ZD560-LH-80
First, the overview across the Walled three hydropower station, located in the northern mountains of Hebei Province at the foot of Yanshan, south of Chicheng County 40km of the Red River, Baihe confluence. The main hydropower station consists of dry masonry steel cage hard-shell diversion spillway dam (height 4m, width 7.5m, length 173m), intake sluice (3m × 3m slab steel gate), red sand sluice gate (5m × 5m slab Steel gate), rectangular round arch diversion tunnel (length 201m, height 3m, width 3m) and other buildings (see below). Power Station Installation ZD560-LH-80