【摘 要】
:
富春江水力发电厂地处浙江省桐庐县境内,位于钱塘江中游富春江七里垅峡谷出口处,是一座低水头河床式日调节水电站,水库正常蓄水位23 m,库容4.4亿m3,总装机容量29.72万kW,多年
论文部分内容阅读
富春江水力发电厂地处浙江省桐庐县境内,位于钱塘江中游富春江七里垅峡谷出口处,是一座低水头河床式日调节水电站,水库正常蓄水位23 m,库容4.4亿m3,总装机容量29.72万kW,多年平均发电量9.23亿kwh。主要担负华东电网调峰、调频及事故备用任务,同时,还具有航运、灌溉、水产养殖、旅游、防洪及城市供水等综合效益。
Fuchunjiang Hydropower Plant is located in Tonglu County, Zhejiang Province, located in the middle reaches of Qiantang River at the exit of Qilu Canyon in Fuchun River. It is a low head riverbed day regulation hydropower station. The reservoir has a normal water storage level of 23 m and a storage capacity of 440 million m3. Capacity 297,200 kW, years of average generating capacity of 923 million kwh. Mainly responsible for the East China Power Grid peak regulation, FM and accident backup tasks, but also with shipping, irrigation, aquaculture, tourism, flood control and urban water supply and other comprehensive benefits.
其他文献
参加这次新搬上舞台剧种会演的铜川市秦剧三团(原富评剧团),演出的阿宫腔《王魁负义》,受到了观摩代表的普遍赞扬。大家觉得这个剧团的进步的确太快了,简直可说是突飞猛进!
戏曲的程式化,是戏曲通过其长期的发展而形成的一种独特的组织结构.但是,这个问题长期以来尚未引起人们的重视。而弄清这个问题,对于更深刻地认识、理解戏曲的发展、演变规
在突出以目标定内容的课堂教学设计过程中,教师应该做到科学、合理地制订教学目标,使其在教学过程中起到导向、激励、凝聚和调控的作用,成为有效课堂教学的一个良
In the co
8月28日到9月12日,四年一届的世界男篮锦标赛将在在土耳其举行。对于自从1994年以来便无缘世锦赛冠军的美国男篮来说,这本是个雪耻的好机会,但意外的是,在北京奥运会上夺得金
第四堵墙“第四堵墙”,原指剧场中将舞台同观众隔开的台框部分,后发展为写实主义舞台的一种理论和常见手法。十九世纪末期的欧洲写实主义,尤其是自然主义剧作家和导演,对舞
产品的造型设计影响着产品最终的成效,客户对于产品的第一印象也是产品的造型设计。由此,产品的造型设计是产品的灵魂所在。本篇文章将以产品造型设计为出发点,对于产品造型
目的探讨Notch信号通路相关分子在脊椎生长过程中的差异表达及其对软骨细胞分化的调控作用。方法采用RT-PCR检测各不同发育年龄段小鼠椎间盘Notch信号分子mRNA的表达情况,筛
请下载后查看,本文暂不支持在线获取查看简介。
Please download to view, this article does not support online access to view profile.
国务院关于《中国教育改革和发展纲要》实施意见明确指出:“认真贯彻教育方针,深入进行教学改革,努力提高教学质量,要进一步转变思想,改革教学内容和教学方法。”为学校教学改革中的教学方法改革提出了严格的要求。本文提出的“小组合作教学法”和其他教学方法比较有其特点和意义:把从过去以教师为核心,转变成为以学生为主导,使学生由客体变为主体,从而调动了学生学习的积极性,促进学生主动地、协调地进行学习,对改进课堂
本刊讯:日前,北京西单图书大厦战锤专柜开幕,来自英国的GAMESWORKSHOP公司重点城市及新兴市场总裁保罗·多布森先生和北京西单图书大厦副总经理杨峰先生亲自出席了本次开幕式