CHOP-like Regimen in Combination with Rituximab and Peginterferon Alpha-2b in Newly-diagnosed Diffus

来源 :临床肿瘤与癌症研究(英文版) | 被引量 : 0次 | 上传用户:ztldkd
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
OBJECTIVE To evaluate the efficacy of rituximab combined with CHOP-like regimen with or without IFN in patients newly diagnosed diffuse large B-cell Non-Hodgkin's lymphoma (DLBCL). METHODS From January 2003 to July 2008, 51 patients received CHOP-like chemotherapy (cyclophosphamide 750 mg/m2, epirubicin 80 mg/m2, vindesine 2.8 mg/m2 on day 1, and prednisolone 100 mg/day on day 1 to day 5). Thirty-one patients received CHOPR-like treatment (rituximab 375 mg/m2 1 day before CHOP-like chemotherapy). Twenty patients received CHOP-like regimen in combination with peginterferon (pegIFN) (1 μg/kg on day 5) and rituximab (on day 6). RESULTS The CR (complete remission) rate in the CHOPR-like (with or without pegIFN) group and in the CHOP-like group was 78.4% and 45.1% (P = 0.005), respectively. The estimated mean time of overall survival (OS) in the CHOPR-like group and CHOP-like group was 58.7 ± 2.8 and 36.4 ± 3.4 months, respectively (P= 0.002). The rates of CR and OR (overall remission) in CHOPR-like with IFN arm were 85.0% and 95.0%, and the rates of those in CHOPR-like without IFN arm were 74.2% and 87.0% (P >0.05). The estimated mean time of 4-year-PFS (progression-free survival) in CHOPR-like with IFN arm and in CHOPR-like without IFN arm was 62.9 ± 3.0 months and 51.0 ± 4.6 months (P =0.092), respectively. In the CHOPR-like with IFN arm, no patient relapsed after achieving CR, while the estimated rate of 4-year-DFS (disease-free survival) in the patients who reached CR in the CHOPR-like without IFN arm was (63.4 ± 19.3)% (P = 0.061). CONCLUSION Rituximab combined with CHOP-like chemotherapy improved the prognosis of DLBCL patients. The IFN may help to improve the quality and duration of response of DLBCL patients treated with rituximab and CHOP-like regimen.
其他文献
进入新世纪,计算机技术和通讯技术的迅猛发展,使得计算机技术被广泛应用于各个领域,其中包括建设施工项目管理。笔者首先简要概述了信息技术在工程项目管理中应用的必要性,基于对
石油化工是我国重要的能源开发产业之一,在国民生产总值中占有举足轻重的地位。随着石化工程的快速发展,石油化工程建设领域开始实行了正规的工程建设监理制度。本文通过对石化
在经济发展,科技进步,生产力水平不断提高的大背景之下,人们生活方式同样处于不断的变化之中,而与人们的生活最为密切相关的居住建筑也在向更广泛以及更深入的方向发展。居住建筑
本文主要介绍了节水灌溉的涵义,分析了节水灌溉技术及对策措施,并阐述了水利工程灌区改造技术以及节水灌溉的发展趋势。
目前我国超概算问题在水利水电工程造价中十分普遍,在工程项目实施阶段概算投资额很难控制,作为产业开发的正常发展影响了水利水电工程项目。中国水利水电施工企业以工程项目管
文章介绍随着智能建筑的发展,一卡通管理系统已经成为智能建筑发展的一种必然趋势,同时详细介绍了“一卡通”管理系统在智能小区中的具体解决方案以及应用实例。
近几年来,我国的经济和科学技术以及人民的生活水平都得到了很多的发展,在这其中,建筑行业也是有着飞速的发展,伴随着我国经济体制的成熟,工程造价管理也出现了很大的变化。因此,本
经济快速发展的今天,高层建筑越来越受人们关注,而带地下室的高层建筑在工程建设中的负荷承载量大、地基埋置的深度深,其嵌固效果对建筑的结构设计影响大,因此,做好高层建筑结构设
本文介绍了天津港集团二、四公司办公楼常规空调系统改造为地源热泵空调的方案设计与工程实施。该工程用可再生能源的地源热泵技术取代了原有的空调冷热源方式,即“热网+电制
随着经济的不断发展和社会进步,我国的城市建设也高速发展,建筑工程施工管理是一个周期长而且持续性的工作,施工管理还关系到政府和相关工作人员高度重视建筑施工的重要因素,因此