概况为了落实伟大领袖毛主席的“五·七”指示,在武汉军区党委的领导下,在省、地,县各级的大力支持下,仅用了八个月时间就胜利建成了以排涝为主的“沉湖‘五·七”泵站“。根据沉湖地区的降雨量和汉江历年的水位变化,以二十年一遇的涝灾,要求在三天解除,故选用了六台长江28型轴流泵(见图1)。总设计排水能力为120米~3/秒,装机容量为九千六百瓩,总投资为七百一十七万五千元。受益面积达四百二十平方公里(相当于六十万亩),使沉湖地区形成了一个完整
Overview In order to implement the ”July 7“ directive of Chairman Mao, the great leader, with the strong support of the military commissions and commissions of the Wuhan Military Region at the provincial, prefectural and county levels, it took only eight months to complete the ” According to the precipitation in the Shenhu area and the water level changes in the Han River over the years, with the floods in 20 years, it is required to be released in three days, so it is selected Six of the Yangtze River 28 axial flow pump (see Figure 1). The total design drainage capacity of 120 m ~ 3 / s, installed capacity of 9,600 瓩, with a total investment of 7,175,000 yuan benefit. An area of 420 square kilometers (equivalent to 600000 acres), so that the formation of a complete Shenhu area