论文部分内容阅读
一、序言秦山核电厂的一回路主系统,在投入运行前需要进行冷态和热态调试,并对主系统及其设备进行性能试验。在预实验过程中,必须清除主回路系统
I. Preface The primary system of the primary circuit of Qinshan NPP needs to be debugged in cold state and thermal state before put into operation, and the performance test of the main system and its equipment is conducted. During the pre-experiment, the main loop system must be cleared