今年六月间,中央建筑工程部水泥工业管理局为了解决我厂窑磨生产不平衡的问题,拨给我厂投资七十万元,要求在年内建成一台二米四直径、十二米长的大型球磨机以及相适应的厂房与输送、选粉设备,以便生产更多的水泥.国家给了投资,我们如何完成这一任务呢?厂里既没有一个设计的洋工程师,材料、设备、施工力量也都有问题.面对这些情况,在干部中间提出了三种不同的意见,一种意见是:七十万元投资根本不够,至少也要用一百万元;而且做这样大的球磨机,全国只有沈阳重型机械厂,今年才第一次生产,我们要想自己做,技术力量、技术水平及设备条件都差得很远,干脆向外承包最为上策.第二种意见是:尽量找承包对象,实在找不到,就自己干.
In June this year, the Central Bureau of Construction Cement Industry Authority in order to solve the problem of unbalanced production of kiln mill I appropriated to our plant 700,000 yuan investment, requiring the construction of a two-meter-four diameter during the year, 12 meters long Large ball mill and the corresponding plant and transportation, powder equipment, in order to produce more cement. The country gave the investment, how do we accomplish this task? The factory neither a design of foreign engineers, materials, equipment, construction In the face of these situations, we put forward three different opinions among the cadres: one is that the investment of 700,000 yuan is not enough and at least one million yuan is needed. And such a big ball mill , Only Shenyang heavy machinery factory in the whole country was the first production this year, we want to do it ourselves, the technical strength, the technical level and the equipment conditions are all very far away from each other, simply outsourcing is the best policy. The second opinion is: try to find Contracted objects, it can not find, do it yourself.