三峡工程永久船闸混凝土施工及质量控制

来源 :水力发电 | 被引量 : 0次 | 上传用户:m1598745
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
三峡工程永久船闸为双线五级连续船闸 ,是目前世界上已建工程中设计水头最高的大型多级船闸。由于高达 170m的开挖边坡所带来的岩体及混凝土结构稳定、运行要求 ,其混凝土施工工艺及质量要求更高。通过参建各方的密切合作 ,不懈努力 ,已解决适合于该船闸混凝土特点的施工方法 ,为高质量地完成混凝土施工奠定了良好基础。三峡工程永久船闸的混凝土施工技术 ,对建设高水头多级船闸工程有重要的参考价值 The permanent ship lock of the Three Gorges Project is a two-lane, five-stage continuous ship lock and is a large multi-stage ship lock with the highest design head in the world. Due to the stability and operation requirements of the rock masses and concrete structures brought by excavation slopes up to 170m, the concrete construction technology and quality requirements are even higher. Through the close cooperation between the parties participating in the project, the Company has worked tirelessly and has solved the construction methods suitable for the characteristics of the shiplock concrete, laying a good foundation for the high-quality completion of concrete construction. The concrete construction technology of the permanent shiplock of the Three Gorges Project has important reference value for the construction of a high-head multi-stage shiplock project
其他文献
合同管理是项目管理的重要组成部分.在合同项目实施过程中,选用适当的技术标准,慎重采用高新技术,对大型基本建设工程是必要的.而合同管理中的变更和索赔,业主可采取必要的措
三峡电站2003年第一批机组投产发电后,电能在华中、华东及重庆地区7省2市的合理消纳,是充分发挥三峡工程效益、防止重复建设的一个重要方面。国务院领导多次就做好此项工作作
工程造价的控制与管理是一项动态的系统工程,需要进行全过程,全方位管理和控制,工程造价审查和控制的目的不仅仅是审查工程费用金额的多少,重要的是通过审查和控制来发现项目投资
期刊
期刊
三峡左岸电站水轮机调速系统、水轮发电机励磁系统国际招标采购合同签字仪式于2000年5月24日在北京举行,阿尔斯通水电公司(Alstom Power Hydro)获得调速系统制造标,伏伊特西
目的:分析丹参酮ⅡA磺酸钠注射液不良反应(ADR)发生的特点,为临床安全用药提供依据.方法:收集本院2010~2015年报告的丹参酮ⅡA磺酸钠注射液ADR病例,进行统计分析.结果:30例ADR
期刊
期刊
我院小儿骨科2000-2009年共收治股骨头骨骺滑脱患儿71例,均采用股骨髁上骨牵引复位,空心钉原位固定术,经过系统的综合护理,效果满意,现报道如下.rn1 临床资料
期刊