在地形起伏较大的山区建厂,有一个重要的问题,就是要侭可能地减少土石方工程。雷义良、王振林两同志提出的“化整为零,化大为小”等措施(见本刊1959年第5期和第11期——编者注),如能因地制宜地运用,是会减少土石方工程量的。但某些车间,如货车装配车间或油漆车间,根据它的工艺特征与要求,其厂房要求有一定的长度,以保证工序工作位置的安排。
One of the important issues in constructing a factory in the mountainous terrain is to reduce the amount of earthwork. The measures “refining and reducing the size of the population” proposed by the two comrades Lei Yiliang and Wang Zhenlin (see the 1959 issue No. 5 and No. 11 of the People’s Republic of China - editor’s note) can be reduced if they can be adapted to local conditions. Earthwork quantity. However, some workshops, such as truck assembly workshop or paint shop, according to its process characteristics and requirements, its plant requirements have a certain length, in order to ensure the arrangement of the working position of the process.