论文部分内容阅读
四川省隆昌县五盘滩水轮泵站建在沱江干流上,安装有川100—15型水轮泵25台,总容量为5000瓩,单机引用流量5米~3/秒,设计水头5.5米,提水扬程73米,单机提水量0.207米~3/秒,该机水泵与水轮机直连,推力轴承露出水面工作,具有效率较高,检查方便等特点,这种水轮泵由省机械设计院设计,重庆铁铸管厂生产,从76年起到现在,共提水1亿3千万立方,设计灌面35万亩,占全县耕地80%,目前,由于配套工程未完工,每年实际灌面为15万亩,使粮食产量逐年有所增加,解决了工农业生产和人畜的用水问题。
Longpan County, Sichuan Province, Wupingshun Turbine Pump Station built in the main Tuojiang River, the installation of Sichuan 100-15-type 25 sets of turbine pumps with a total capacity of 5000 瓩, single reference flow of 5 to 3 / s, the design head of 5.5 meters, Lift lift 73 meters, single lift 0.207 m ~ 3 / s, the pump directly connected with the turbine, the thrust bearing exposed surface work, with higher efficiency, easy to check and so on, this turbine by the provincial mechanical design institute Design, Chongqing Iron Casting Plant production, from 76 to now, a total of 300000000 cubic meters of water, design irrigation 350000 acres, accounting for 80% of the county arable land, at present, due to the supporting project is not completed, the actual annual Irrigation 15 million mu, so that food production has increased year by year, to solve the industrial and agricultural production and human and animal water issues.