南京站旅客进站天桥施工技术

来源 :上海铁道科技 | 被引量 : 0次 | 上传用户:hujin68
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1工程概况南京站站改工程旅客进站天桥计两座,为钢管全焊桁架式结构,全长79.449m,桥宽6.6m,桥梁顶部(上弦杆)标高12.659m,桥面标高9.3m,桥面系为满布间距0.5m的H型钢悬挂在桁架下弦上,上面铺设钢板,并与H型钢满焊,在二、三、四站台由钢梯和扶梯通向站台,东侧天桥还设了三部垂直电梯,桥顶局部设有雨棚,其他设有水平支撑。基础 1 Project Overview Nanjing Station Station to change the project passenger pit stop two, for the welded steel truss structure, a total length of 79.449m, bridge width 6.6m, the top of the bridge (winding rod) elevation 12.659m, deck elevation 9.3m, the deck is full of cloth spacing 0.5m H-beam suspended in the truss chord, the above laying of steel, and full with H-beam welding, in the second, third and fourth stations by steel ladders and escalators to the platform, The east side of the flyover also has three vertical elevators, the top of the bridge with a canopy, the other with horizontal support. basis
其他文献
“十二五”时期是我国全面建设小康社会的关键时期,是提高自主创新能力、建设创新型国家、深化改革开放、加快转变经济发展方式的攻坚时期,工业化、信息化、城镇化、市场化、
铁路路基经过的地段常遇到地质溶洞和上世纪遗留的工业采空区,由于在实际施工中地下情况的不确定性,工程部门一般采用钻孔后压浆灌注施工工艺进行处理。钻孔后压浆灌注法也是
期刊
我院对乙型肝炎(乙肝)疫苗纳入儿童计划免疫后医院产房新生儿首针乙肝疫苗及卡介苗接种情进行分析。1资料与方法2002年7月1日至2005年9月30日在我院出生的1025名新生儿首针乙
(本刊讯)意大利拓斯克公司为维达纸业(浙江)有限公司提供的2台卫生纸机(PM3和PM4)于2016年12月发货,计划于2017年春天开始安装,2017年年中开机.这2台纸机采用了拓斯克干燥优
期刊
合武铁路客运专线以路堤穿越膨胀土区域有一百多公里,涉及石灰改性膨胀土填料近千万方,石灰改性膨胀土路堤质量控制的好坏制约着合武铁路工程建设的成败。因此,了解膨胀土的
期刊
2016年9月23日,2016(第十八届)中国国际矿业大会在天津梅江会展中心开幕。围绕着“秉持新理念,共创新未来”的大会主题,来自全球50余个国家和地区,8 000多名国内外代表针对当
整个矿业界都在密切关注力拓集团在西澳大利亚皮尔布拉布置的自动铁路运输系统何时重新启动,这个“AutoHaul”(自动运输)项目原定于2015年启动,但是由于软件故障被延期至少3年。