论文部分内容阅读
Run 2 at Fermilab began in March,2001,CDF will collect data at a maximum rate of 20 MByte/sec during the run.The offline reconstruction of this data must keep up with the data taking rate.This reconstruction occurs on a large PC farm,which must have the c