论文部分内容阅读
摘自《中州建筑》河南省建筑第一公司采用下述操作工艺,较好地防止了水泥砂浆地坪空鼓、起砂、裂缝。首先应按一般做法,用钢刷清擦混凝土表面,洒水湿润,贴饼、找平。然后再按下述方法操作:1.刷107胶素水泥一道(水泥与107胶按5:1配比)。用60℃热水把107胶溶化,然后与水泥调和成糊状,用棕刷子用力涂刷在楼板上,往返涂刷4~5次,使水泥浆与楼板表面充分接触,增加粘结力。2.摊抹1:3水泥砂浆作底层。107胶水泥浆刷过后,
Excerpted from “Zhongzhou Construction” Henan Provincial Construction First Company adopted the following operating procedures to better prevent emptying, sanding, and cracking of the cement mortar floor. First of all, according to the general practice, wipe the concrete surface with a steel brush, moisten the sprinkler, apply the cake, and level it. Then follow the following methods: 1. Brush 107 gelling cement together (cement and 107 glue by 5:1 ratio). The peptized glue is melted with 60°C hot water and then blended with the cement to form a paste. The brown brush is applied to the floorboards, brushing 4 to 5 times in a round-trip manner, so that the cement slurry is in full contact with the floor surface and the adhesion is increased. 2. Spread 1:3 cement mortar as the bottom layer. After 107 cement paste brush,