据《Теплоэнергетика》2012年3月刊报道,俄罗斯中央锅炉涡轮机研究所的专家列出了西北热电站1号动力机组ПГУ-450Т的П-90余热锅炉工作及其蒸发管弯曲处破坏原因。分析了允许利用ГТЭ-160代替V-94.2燃气轮机的技术方案。安装新ГТЭ-160燃气轮机并利用现有的П-90余热锅炉导致在冷凝工况下汽轮机功率减少4.5~12.5 MW。但是,在余热锅炉和ГТЭ-160一起工作时,蒸汽过热器和高压蒸发器的管子应用更稠密散热
According to the “Теплоэнергетика” March 2012 issue, experts from the Russian Central Boiler and Turbine Research Institute listed the cause of the destruction of the П-90 heat recovery boiler and its evaporation tube bend at ПГУ-450Т, Unit 1, Northwest Thermal Power Station. The technical solution that allows the use of ГТЭ-160 instead of the V-94.2 gas turbine was analyzed. The installation of a new ГТЭ-160 gas turbine and utilization of the existing П-90 waste heat boiler resulted in a reduction of 4.5 to 12.5 MW of turbine power in condensing conditions. However, when the waste heat boiler and ГТЭ-160 work together, the tubes of the vapor superheater and the high pressure evaporator are applied more densely