摘要:随着现代建筑工程建设要求的不断提高,建设施工技术也随之在进行的革新和完善,混凝土施工技术便是其中之一。在建筑工程建设行业中混凝土新技术、新材料被不断开发和应用的同时,不仅在一定程度上提升了混凝土施工技术的发展与应用的空间,更极大的促进了我国建筑工程行业的快速发展。本文在此对建筑混凝土施工技术的几个要点做了详细的研究。
关键词:混凝土;浇筑;振捣;养护
Abstract: With the requirement of modern architectural engineering construction continuously improve the construction technology, construction is also in there form and the consummation, the concrete construction technology is one of them. The concrete in the construction industry new technology, new materials development and application at the same time, not only to a certain extent, promoted the development and application of concrete construction technology space, more greatly promoted the rapid development of construction industry in china. Several key points of construction technology of concrete for construction this paper made a detailed study.
Key words: concrete; pouring; vibration; maintenance
中图分类号:TU74 文献标识码:文章编号:
一、我国建筑工程施工建设当中所采用的混凝土施工方法概述
1、基础施工
土木工程的基础施工指的是建筑的地基施工,在挖掘地基的时候应该采取由浅入深的方式,先开展深基础施工,再开展浅基础施工,以这样的方式保障土木工程项目周边建筑物的安全。在地基施工中特别要重视基坑的排水和降水工作,以确保施工中的地基安全。
2、承台施工
承台施工应该依据建筑物的标准高度开展有针对性的测量,通常的建筑物承台是以间隔水平分割为主的,通常主楼的基础是以两层楼的施工为主,两层都必须浇筑混凝土,浇灌时间通常以六天为间隔,两层间的厚度要求也很严格,通常要超过1.50 米上,而且层与层之间必须采取一定的间隔措施,通常应该采用抗拉钢筋为间隔工具。在条件允许的情况下,使用这种施工方式不但能够有效降低混凝土的内部温度,还能降低施工成本,节约资源。
3、严格遵守混凝土的施工顺序
在建筑工程混凝土施工过程中,必须按照施工顺序进行施工。通常是采用从远到近的顺序实施施工,因为混凝土施工有时候会处在不平坦的地点上,在这种有坡度的地点施工时,必须确保混凝土首次浇灌就要成功,继而再推进到另外一边,最后到达顶端。在混凝土施工的整个过程中,一定要将混凝土输送泵放置在施工场地的中间,这样会比较方便输送。
二、选用符合标准的建筑材料
选用符合标准的建筑材料对于房屋建筑是特别重要的一项工作,不仅要选择质量上乘的材料,还要使材料满足建筑需求。通过优化混凝土配合比例,可以有效避免混凝土裂缝发生。
1、水泥的选择
水热化水泥材料是造成混凝土裂缝的主要原因。在建筑施工的过程中为了确保水泥的质量完整,应尽量避免小生产厂生产的水泥。并且,选购水泥的人员应要求厂家出示水泥出厂适量保证书,确定水泥的安定性、强度和凝结时间符合施工要求。
2、砂石的选择
房屋建设中的砂石(即骨料)的选择要求比较严格,所选的砂石应当满足高强度、高质量、无有机杂质以及物理化学性质高。在房屋建设中的骨料又分为粗骨料和细骨料,粗骨料最好选用自然连续级配合碎石,碎石最大粒径应小于结构截面最小尺寸的1/4,且小于钢筋间距最小距的3/4。细骨料最好采用中粗砂。
3、外加剂的选择
选择合适的外加剂是避免混凝土开裂的重要措施。而粉煤灰是所有外加剂里防裂效果最好的,粉煤灰的运用能有效的改善混凝土干缩性,降低混凝土的水热化。
4、配合比的选择
混凝土的配合比直接关系到混凝土的质量,如果配合比出现了问题,那配置出来的混凝土将无法满足房屋施工的要求。配合比应满足强度等级、混凝土性能等基本要求。
三、对钢模的要求与处理
浇筑混凝土之前,应检查钢筋的种类、格、数量、位置、接头和保护层厚度是否准确,发现问题并及时修整。为了保证混凝土保护层的厚度,要注意固定好垫块。一般每隔1m左右要在钢筋上绑一个水泥砂浆垫块。当钢筋比较密集时,混凝土的浇筑应选择适当的石子。石子最大的粒径不得超过结构截面的最小尺寸的四分之一,也不得大于钢筋净距的四分之三。结构截面比较小、钢筋比较密时,可用豆石混凝土浇筑。为了防止钢筋移位,在钢筋密集处,可采用带刀片的振捣棒。保护层的混凝土必须振捣密实。在操作时不能踩踏钢筋,若钢筋有踩弯或脱扣的,应当及时调整。钢筋的搭接也必须保证一定的长度。
四、混凝土的浇筑
混凝土应在开始凝前浇筑,若浇筑前已经有了初凝现象那么应该再进行一次强力搅拌, 让其恢复流动性后,才可以入模。在浇筑前混凝土若已经有离析现象,也需要重新拌合后才能浇筑。浇筑过程中为了避免出现生离析现象,混凝土的自由倾落高度一般不应该超过2m。浇筑楼板的混凝土时,自由倾落高度不应当超过1m。若超出上述高度,应该采取串筒、溜槽等方法下料。溜槽一般由木板钉成,表面被包铁皮,使用的时候它的水平倾角不应当超过 30°。串筒由薄钢板制成。每节筒长70cm 左右,用钩环连接,筒内设有缓冲挡板。混凝土的浇捣应当分层进行。
五、混凝土柱、梁、板的浇筑
混凝土柱子浇筑最好在梁板模安装完毕和钢筋未绑扎之前执行,为了利用梁板模来稳定柱模并且用作浇灌混凝土平台。当灌筑一排柱子时,应当从两端同时开始向中间推进,而不应当从一端推向另一端,为了避免因灌筑混凝土后,模板吸水膨胀而产生横向推力,累积到最后一根造成弯曲变形。柱子应沿高度一次灌筑完毕。当柱截面在 40X40cm 以上且无交叉箍筋时,如果柱高不超过三米半,可以从柱顶直接浇灌;如果超过三米半,必须分段浇灌,每段高不超过三米半(墙和隔墙不超过3m),或者采用竖向串筒输送混凝土。当柱截面在 40×40cm 以内或有交叉箍筋时,应在柱模侧面不小于30cm 高的门子洞作浇灌口,装斜溜槽分段灌筑,每段高不得超过2m。另外,柱子和板墙支模前,应在边模板下口抹8cm宽处找平层,找平层嵌入柱、板墙体不超过1cm,保证下口严密。开始浇筑混凝土时,底部应先填 50~100mm 与浇筑混凝土配制相同的水泥砂浆。砂浆应用铁锹人模,不得用料斗直接灌入模內。混凝土坍落度应当严格控制,底层振捣也应该认真操作。柱子浇筑完毕,应当停歇1-2 小时,以便混凝土初步沉实,排除渗水,再浇筑梁板。肋形楼板的梁板应同时浇灌,先将梁的混凝土分层浇灌成阶梯形向前推进,当起始点的混凝土达到板底位置时,即与板的混凝土一起浇捣,随着阶梯的不断延长,板的灌筑也不断向前推进,倾倒混凝土的方向应与浇灌方向相反,不得顺着浇灌方向灌筑。当梁的高度大于1m 时,可先将梁单独浇灌至距板底以下2~3cm 处留施工缝。
六、混凝土的振捣
当在捣实混凝土拌合物时,插入式振捣器应该采用垂直振捣的方法,即振捣棒与混凝土表面垂直或斜向振捣。斜向振捣时振捣棒与混凝土表面的角度约40°-50°。振捣器的插点应均匀排列,用行列式或交错式顺序移动,不应混用,以免漏振。每次移动的间距不应当大于其作用半径的1.5 倍;而针对于轻骨料混凝土拌合物,则不应当大于他的作用半径的一倍。振捣器至模板的距离也不应当大于振捣器的有效作用半径的二分之一。为了保证上下层混凝土结合状况良好,振捣棒应插入下层混凝土5cm。操作时应快插慢拔。平放振捣器在相邻两段之间应搭接振捣3~5cm。
七、混凝土养护
混凝土浇筑并振捣完毕后为保证其强度并防止产生收缩,应保持其实润,并在 12h 内对其进行覆盖养护,养护时间不少于14d,高温季节应适当延长养护时间及浇水次數;应严格控制混凝土拆模时间以免拆模时出现掉角、起皮现象,在拆模前应对混凝土进行充分洒水养护,使水分通过混凝土和模板间隙渗入混凝土内部,拆模完成应避免立即洒水养护以免出现温差裂缝,并不得直接用草垫铺盖在混凝土外表面造成黄色污染;拆模完成并洒水完毕应用塑料薄膜包裹,尤其应将接茬部位严密并压实;冬季施工应在混凝土内掺加早强抗冻剂,且对混凝土养护不得直接洒水,而应在混凝土表面涂刷无色渗透封闭性保护液来养护,或在拆模后立即覆盖塑料薄膜,并在塑料薄膜表面加盖阻燃草帘后再覆盖保温材料。
八、裂缝的防治
在建筑混凝土施工的全过程中,混凝土出现裂缝是难以避免的,在出现了裂缝之后该如何治理是个关键的问题。首先应充分了解设计意图和技术要求,严格的遵守设计和施工规范。当不可避免地出现了裂缝时,应认真地分析出现裂缝的原因和裂缝的性质,根据不同受力情况和使用要求分别采取不同的治理办法。选择处理的方法应从实际出发,需做到安全可靠,并且要考虑到技术方面的问题,尽量简单施工,以符合经济原则为准则。处理后的裂缝应保证做到原有的承载力、抗渗性和整体性。还要防止人为地进一步的损害结构和构建,尽可能地避免大改大补,应保持原结构的外观。一般的治理方法有:
1、表面修补法。该法适用于较窄的裂缝,修补其表面美观和提高耐久性时所采用。
2、填充法。适用于裂缝较宽的构建。
3、注入法。当裂缝较窄且较深时,可以采用将修补材料注入混凝土内部的方法来修补。注入法又分为加大截面加固法、外包钢加固法、预应力加固法、改变传力途径加固法、外部粘贴钢板加固法和粘贴纤维增强复合材料加固法等。需根据实际情况的不同来定制不同的修补方法。
参考文献:
[1]贲卫东:《混凝土工程质量控制研究》,《中国西部科技》,2009(3).
[2]杨竸.混凝土浇筑施工的几个技术问题.[J]中国房地产业,2011,(03)
[3]姚兵编著.我国混凝土技术的成就和发展[M],北京:中国建筑工业出版社,2011,(1).
关键词:混凝土;浇筑;振捣;养护
Abstract: With the requirement of modern architectural engineering construction continuously improve the construction technology, construction is also in there form and the consummation, the concrete construction technology is one of them. The concrete in the construction industry new technology, new materials development and application at the same time, not only to a certain extent, promoted the development and application of concrete construction technology space, more greatly promoted the rapid development of construction industry in china. Several key points of construction technology of concrete for construction this paper made a detailed study.
Key words: concrete; pouring; vibration; maintenance
中图分类号:TU74 文献标识码:文章编号:
一、我国建筑工程施工建设当中所采用的混凝土施工方法概述
1、基础施工
土木工程的基础施工指的是建筑的地基施工,在挖掘地基的时候应该采取由浅入深的方式,先开展深基础施工,再开展浅基础施工,以这样的方式保障土木工程项目周边建筑物的安全。在地基施工中特别要重视基坑的排水和降水工作,以确保施工中的地基安全。
2、承台施工
承台施工应该依据建筑物的标准高度开展有针对性的测量,通常的建筑物承台是以间隔水平分割为主的,通常主楼的基础是以两层楼的施工为主,两层都必须浇筑混凝土,浇灌时间通常以六天为间隔,两层间的厚度要求也很严格,通常要超过1.50 米上,而且层与层之间必须采取一定的间隔措施,通常应该采用抗拉钢筋为间隔工具。在条件允许的情况下,使用这种施工方式不但能够有效降低混凝土的内部温度,还能降低施工成本,节约资源。
3、严格遵守混凝土的施工顺序
在建筑工程混凝土施工过程中,必须按照施工顺序进行施工。通常是采用从远到近的顺序实施施工,因为混凝土施工有时候会处在不平坦的地点上,在这种有坡度的地点施工时,必须确保混凝土首次浇灌就要成功,继而再推进到另外一边,最后到达顶端。在混凝土施工的整个过程中,一定要将混凝土输送泵放置在施工场地的中间,这样会比较方便输送。
二、选用符合标准的建筑材料
选用符合标准的建筑材料对于房屋建筑是特别重要的一项工作,不仅要选择质量上乘的材料,还要使材料满足建筑需求。通过优化混凝土配合比例,可以有效避免混凝土裂缝发生。
1、水泥的选择
水热化水泥材料是造成混凝土裂缝的主要原因。在建筑施工的过程中为了确保水泥的质量完整,应尽量避免小生产厂生产的水泥。并且,选购水泥的人员应要求厂家出示水泥出厂适量保证书,确定水泥的安定性、强度和凝结时间符合施工要求。
2、砂石的选择
房屋建设中的砂石(即骨料)的选择要求比较严格,所选的砂石应当满足高强度、高质量、无有机杂质以及物理化学性质高。在房屋建设中的骨料又分为粗骨料和细骨料,粗骨料最好选用自然连续级配合碎石,碎石最大粒径应小于结构截面最小尺寸的1/4,且小于钢筋间距最小距的3/4。细骨料最好采用中粗砂。
3、外加剂的选择
选择合适的外加剂是避免混凝土开裂的重要措施。而粉煤灰是所有外加剂里防裂效果最好的,粉煤灰的运用能有效的改善混凝土干缩性,降低混凝土的水热化。
4、配合比的选择
混凝土的配合比直接关系到混凝土的质量,如果配合比出现了问题,那配置出来的混凝土将无法满足房屋施工的要求。配合比应满足强度等级、混凝土性能等基本要求。
三、对钢模的要求与处理
浇筑混凝土之前,应检查钢筋的种类、格、数量、位置、接头和保护层厚度是否准确,发现问题并及时修整。为了保证混凝土保护层的厚度,要注意固定好垫块。一般每隔1m左右要在钢筋上绑一个水泥砂浆垫块。当钢筋比较密集时,混凝土的浇筑应选择适当的石子。石子最大的粒径不得超过结构截面的最小尺寸的四分之一,也不得大于钢筋净距的四分之三。结构截面比较小、钢筋比较密时,可用豆石混凝土浇筑。为了防止钢筋移位,在钢筋密集处,可采用带刀片的振捣棒。保护层的混凝土必须振捣密实。在操作时不能踩踏钢筋,若钢筋有踩弯或脱扣的,应当及时调整。钢筋的搭接也必须保证一定的长度。
四、混凝土的浇筑
混凝土应在开始凝前浇筑,若浇筑前已经有了初凝现象那么应该再进行一次强力搅拌, 让其恢复流动性后,才可以入模。在浇筑前混凝土若已经有离析现象,也需要重新拌合后才能浇筑。浇筑过程中为了避免出现生离析现象,混凝土的自由倾落高度一般不应该超过2m。浇筑楼板的混凝土时,自由倾落高度不应当超过1m。若超出上述高度,应该采取串筒、溜槽等方法下料。溜槽一般由木板钉成,表面被包铁皮,使用的时候它的水平倾角不应当超过 30°。串筒由薄钢板制成。每节筒长70cm 左右,用钩环连接,筒内设有缓冲挡板。混凝土的浇捣应当分层进行。
五、混凝土柱、梁、板的浇筑
混凝土柱子浇筑最好在梁板模安装完毕和钢筋未绑扎之前执行,为了利用梁板模来稳定柱模并且用作浇灌混凝土平台。当灌筑一排柱子时,应当从两端同时开始向中间推进,而不应当从一端推向另一端,为了避免因灌筑混凝土后,模板吸水膨胀而产生横向推力,累积到最后一根造成弯曲变形。柱子应沿高度一次灌筑完毕。当柱截面在 40X40cm 以上且无交叉箍筋时,如果柱高不超过三米半,可以从柱顶直接浇灌;如果超过三米半,必须分段浇灌,每段高不超过三米半(墙和隔墙不超过3m),或者采用竖向串筒输送混凝土。当柱截面在 40×40cm 以内或有交叉箍筋时,应在柱模侧面不小于30cm 高的门子洞作浇灌口,装斜溜槽分段灌筑,每段高不得超过2m。另外,柱子和板墙支模前,应在边模板下口抹8cm宽处找平层,找平层嵌入柱、板墙体不超过1cm,保证下口严密。开始浇筑混凝土时,底部应先填 50~100mm 与浇筑混凝土配制相同的水泥砂浆。砂浆应用铁锹人模,不得用料斗直接灌入模內。混凝土坍落度应当严格控制,底层振捣也应该认真操作。柱子浇筑完毕,应当停歇1-2 小时,以便混凝土初步沉实,排除渗水,再浇筑梁板。肋形楼板的梁板应同时浇灌,先将梁的混凝土分层浇灌成阶梯形向前推进,当起始点的混凝土达到板底位置时,即与板的混凝土一起浇捣,随着阶梯的不断延长,板的灌筑也不断向前推进,倾倒混凝土的方向应与浇灌方向相反,不得顺着浇灌方向灌筑。当梁的高度大于1m 时,可先将梁单独浇灌至距板底以下2~3cm 处留施工缝。
六、混凝土的振捣
当在捣实混凝土拌合物时,插入式振捣器应该采用垂直振捣的方法,即振捣棒与混凝土表面垂直或斜向振捣。斜向振捣时振捣棒与混凝土表面的角度约40°-50°。振捣器的插点应均匀排列,用行列式或交错式顺序移动,不应混用,以免漏振。每次移动的间距不应当大于其作用半径的1.5 倍;而针对于轻骨料混凝土拌合物,则不应当大于他的作用半径的一倍。振捣器至模板的距离也不应当大于振捣器的有效作用半径的二分之一。为了保证上下层混凝土结合状况良好,振捣棒应插入下层混凝土5cm。操作时应快插慢拔。平放振捣器在相邻两段之间应搭接振捣3~5cm。
七、混凝土养护
混凝土浇筑并振捣完毕后为保证其强度并防止产生收缩,应保持其实润,并在 12h 内对其进行覆盖养护,养护时间不少于14d,高温季节应适当延长养护时间及浇水次數;应严格控制混凝土拆模时间以免拆模时出现掉角、起皮现象,在拆模前应对混凝土进行充分洒水养护,使水分通过混凝土和模板间隙渗入混凝土内部,拆模完成应避免立即洒水养护以免出现温差裂缝,并不得直接用草垫铺盖在混凝土外表面造成黄色污染;拆模完成并洒水完毕应用塑料薄膜包裹,尤其应将接茬部位严密并压实;冬季施工应在混凝土内掺加早强抗冻剂,且对混凝土养护不得直接洒水,而应在混凝土表面涂刷无色渗透封闭性保护液来养护,或在拆模后立即覆盖塑料薄膜,并在塑料薄膜表面加盖阻燃草帘后再覆盖保温材料。
八、裂缝的防治
在建筑混凝土施工的全过程中,混凝土出现裂缝是难以避免的,在出现了裂缝之后该如何治理是个关键的问题。首先应充分了解设计意图和技术要求,严格的遵守设计和施工规范。当不可避免地出现了裂缝时,应认真地分析出现裂缝的原因和裂缝的性质,根据不同受力情况和使用要求分别采取不同的治理办法。选择处理的方法应从实际出发,需做到安全可靠,并且要考虑到技术方面的问题,尽量简单施工,以符合经济原则为准则。处理后的裂缝应保证做到原有的承载力、抗渗性和整体性。还要防止人为地进一步的损害结构和构建,尽可能地避免大改大补,应保持原结构的外观。一般的治理方法有:
1、表面修补法。该法适用于较窄的裂缝,修补其表面美观和提高耐久性时所采用。
2、填充法。适用于裂缝较宽的构建。
3、注入法。当裂缝较窄且较深时,可以采用将修补材料注入混凝土内部的方法来修补。注入法又分为加大截面加固法、外包钢加固法、预应力加固法、改变传力途径加固法、外部粘贴钢板加固法和粘贴纤维增强复合材料加固法等。需根据实际情况的不同来定制不同的修补方法。