论文部分内容阅读
In 2009,the main work of the 320 kV HV platform was tuning,experimenting and improving.Bi and Cion beams have been delivered by the LAPECR2 source with TWT-14 .5 GHz microwave gen-erator .
In 2009, the main work of the 320 kV HV platform was tuning, experimenting and improving. Bi and Cion beams have been delivered by the LAPECR2 source with TWT-14 .5 GHz microwave gen-erator.