某厂是我国引进闪速熔炼新工艺的炼铜厂。1985年7月18日下午,该厂进行关键设备电气连锁试验时发生火灾,使硫酸车间电除雾器第三系列全部烧毁,第二、第四系列部分烧损,鳞片烟道烧坏。由于急于投产,在没有彻底查明原因的情况下清理了现场并进行抢修。在修复第二系列电除雾器时又发生大火,使该系列全部含碳玻璃钢阳极板和阴极线以及绝大部分壳体内壁玻璃钢被烧毁,壳体内部钢结构严重
A factory is China’s introduction of new smelting flash smelting copper plant. On the afternoon of July 18, 1985, a fire broke out in the electric chain test of the key equipment of the plant, causing the third series of electric mist eliminator in the sulfuric acid workshop to be completely destroyed. The second and fourth series of partial burning and scale flue burned out. Due to the rush to put into operation, the site was cleared and repaired without a thorough identification of the cause. In the repair of the second series of electric mist eliminator occurred again when the fire, so that all series of carbon-containing glass fiber reinforced plastic anode and cathode lines and most of the inner wall of glass fiber reinforced plastic shell was destroyed, the internal steel structure is serious