新港船厂大坞东西墙支撑工作平台,原设计如照片一所示,为1.2×1.2米见方的实体)每段长25.5米)。在施工中一处四队广大革命职工纷纷建议改成空心结构,在领导的大力支持下,成功地采用了充气橡胶囊的新技术。实行了这一建议如照片二、三所示,为国家节省了约60立方米的混凝土,价值4000元左右。这项建议虽小,可是它的实现却也充满着两种思想的斗争。在浇注第一段坞墙时,就有
Xingang Shipyard large wharf wall support platform, the original design shown in the photo as a 1.2 × 1.2 m square entity) each length 25.5 m). In the construction of a team of four revolutionary majority of workers have proposed to change to hollow structure, with the strong support of the leadership, the successful use of inflatable rubber capsule of new technologies. The implementation of this proposal, as shown in photos II and III, saved about 60 cubic meters of concrete for the country at a value of about 4,000 yuan. This proposal is small, but its realization is also filled with two kinds of ideological struggles. When pouring the first wall, there is