厦门保利叁仟栋工程的场地将开展地下室的工程建设工作。该地下室的建设需要开展基坑支护工程,并且利用基坑支护来加固地下室工程的墙体。为了确保工程质量,在工程开展之前就对本次工程选择了施工方案。本次施工选择三轴搅拌桩施工方案为主要的施工技术,本文将简单介绍工程,并详细阐述施工过程,明确施工的技术要点以及防护要求,期望施工人员能够严格按照施工图纸的要求完成施工,保障施工安全。
Poly Paul Thousands of Xiamen project site will carry out basement construction work. The construction of the basement needs to be carried out in support of foundation pit and the use of foundation pit support to reinforce the wall of the basement project. In order to ensure the quality of the project, the construction plan was chosen for this project before the project commenced. The construction selection of three-axis mixing pile construction program as the main construction technology, this article will briefly introduce the project, and elaborated the construction process, a clear construction of the technical points and protection requirements, expect the construction staff to be in strict accordance with the requirements of the construction drawings to complete the construction, To protect the construction safety.