论文部分内容阅读
为了使自磨磨矿技术应用在有色金属选矿中,在长沙有色冶金设计院、南昌有色冶金设计院、一机部洛阳矿山机械研究所、上海冶金矿山机器厂等兄弟单位的大力支持配合下,于1972年在我矿建成φ2.4×0.9米湿式自磨试验厂,并于1973年初开始了试验,经过一年多的共同努力,已基本完成了一段自磨流程的各项工艺条件试验,共运转了2000多小时,处理了3000多吨矿石。试验初步表明,湿式自磨处理我矿
In order to make the application of self-abrasive grinding technology in nonferrous metal beneficiation, with the strong support of Changsha Nonferrous Metallurgy Design Institute, Nanchang Nonferrous Metallurgy Design Institute, Luji Mining Machinery Research Institute of No.1 Machine Department and Shanghai Metallurgical Mining Machinery Factory, In 1972, we built φ2.4 × 0.9m wet self-abrasive test plant in our mine and started the test in early 1973. After more than a year’s hard work, we have basically completed a series of test of process conditions for self- A total of more than 2000 hours operation, processing more than 3,000 tons of ore. Preliminary tests show that wet self-grinding mine processing