泄湖峡水电站位于甘肃省临夏地区大夏河末端,是引水式电站,引水渠长2km,设计水头35.4m,流量17m~3/S,装有1台3000kW国产机组和1台1560kW保加利亚引进的机组。电站于1969年投入运行,由于在水工设计中对电站冬季运行缺乏有效措施,致使电站的前池和钢管在冬季被冰凌堵塞,造成电站投产后有8个冬季不能正常运行。为解决这个问题,采取了
Located at the end of Daxia River in Linxia region, Gansu Province, the Xiehuo Gorge Hydropower Station is a diversion power station with 2km of diversion channel, 35.4m head and 17m ~ 3 / S flow rate. The unit is equipped with one 3000kW domestic unit and one 1560kW Bulgaria imported unit . The power station was put into operation in 1969. Due to the lack of effective measures for the winter operation of the power station in the hydraulic design, the front pool and the steel pipe of the power station were blocked by the ice in winter, resulting in 8 winter operations of the power plant being inoperable. To solve this problem, taken