一、前言天水架修库扩建部分钢筋混凝土及钢拉杆组合屋架(以下简称屋架),跨度21.8米(跨三股道),间距4米,屋架二支点简支于砖柱上。屋面为粘土瓦木檩条,混凝土标号为150级,钢筋为3号圓钢。屋架上弦为钢筋混凝土杆,下弦为裸露钢拉杆。新建设计时考虑每一股道上安装一个排烟罩,每个排烟罩集中荷重为1t(实际并未安没)。该屋架于1961年4月基建竣工。这次架修库大修,屋架加固工程为其中的一部分。加固工程并已交付使用将近两年,屋架技术状态良好。这种大跨度组合屋架加固工程,我们还是首次进行。技术要求高,又无现成经验,施工又在不卸荷載情况下进行,工人又必须在高空作业,这些情况构成了该项工程的复杂性。屋架型式见图1。
I. INTRODUCTION The expansion of part of reinforced concrete and steel tie bar roof truss (with a span of 21.8 meters (spanning three strands)) at a spacing of 4 meters at the Tianshui Retrofitting Library for a part of the two fulcrums of the roof truss is simply supported by brick columns. The roof tile clay tile purlin, concrete grade 150, steel bar No. 3. Rooftop ridge for the reinforced concrete pole, the lower end of the bare steel rod. Consider installing a fume hood on each track for a new construction timeline, with a concentration of 1t per fume hood (actually not being safe). The truss was completed in April 1961. The shelf repair overhaul, truss reinforcement project as part of it. The reinforcement works have been delivered for nearly two years and the roof truss technology is in good condition. This long-span combined roof truss reinforcement project, we for the first time. The high technical requirements and the lack of ready experience have led to the construction being carried out without load shedding and the workers having to work at altitudes. These conditions make up the complexity of the project. Roof type shown in Figure 1.