舞阳铁矿在对破碎设备冷却水系统进行改造后 ,停用了 3台冷却泵 ,1座冷却塔 ,冷却水作为生产补加新水直接被利用 ,具有明显的节水节电效果。
After the reconstruction of the cooling water system of the crushing equipment, Wuyang Iron Mine stopped using 3 cooling pumps and a cooling tower, and the cooling water was directly used as additional water for production to produce the water and electricity saving effect obviously.