论文部分内容阅读
上海汽车发动机厂广大工人和技术人员在厂党委的正确领导下,在批林批孔运动的推动下,遵照伟大领袖毛主席关于“备战、备荒、为人民”及“独立自主、自力更生”的教导,高举“鞍钢宪法”光辉旗帜,开展“工业学大庆”的运动,坚持“三结合”道路,在1947年10月到12月短短的三个月时间内,制造、安装、调整了一条整体床身式的小型组合机床自动线(见图1)。这条线现已投产使用,证明性能良好,工作可靠,基本上达到了原设计要求。该线是由上海汽车发动机厂和大连组合机床研究所“三结合”设计的。
Under the correct leadership of the Party Committee and Party Committee of Shanghai Automotive Engine Factory and under the correct leadership of the Party Committee and Party Committee of Shanghai Automotive Engine Factory, with the guidance of Chairman Mao on “preparing for war, preparing for the poor, for the people” and “being independent and self-reliant” under the motto of “ Hold high the banner of the Ansteel Constitution, carry out the campaign of ”Daqing in Industrial Science“, adhere to the ”three combined“ path, and make, install and adjust an integral bed within a short span of three months from October to December 1947 Body type small combined machine automatic line (see Figure 1). This line has been put into operation, proved good performance, reliable work, basically reached the original design requirements. The line by the Shanghai Automotive Engine Factory and Dalian Institute of Machine Tool combination of ”three" design.