万家寨引黄工程是解决山西水资源紧缺,促进山西工农业生产发展,提高人民生活水平,维系国家能源重化工基地发展的生命工程,由万家寨水利枢纽、总干、南干、连接段、北干等部分组成。枢纽工程在万家寨修建90m高的混凝土重力坝,库容8.96亿m~3,坝后建一调峰电站,装机容量108MW,年发电量27.5亿kW·h。引黄工程从万家寨库
Wanjiazhai Yellow River Diversion Project is to solve the shortage of water resources in Shanxi Province, Shanxi Province to promote industrial and agricultural production and development, improve people’s living standards and maintain the development of national energy and heavy chemical industry base of life projects from the Wanjiazhai Water Control Project, the total dry, dry South, connecting Section, North dry and other components. The hub project will construct a 90-m-high concrete gravity dam in Wanjiazhai with a storage capacity of 896 million m 3 and a peaking peak-load station with a installed capacity of 108MW and an annual generating capacity of 2.75 billion kW · h. Yellow River project from Wanjiazhai library