论文部分内容阅读
根据污水泵站工艺流程,通过对现有集控系统进行分析,解决了原系统中存在的问题,并根据用户需求,对控制系统进行了改造,达到了预期的目标。
According to the technological process of sewage pumping station, the existing centralized control system was analyzed to solve the existing problems in the original system. According to the needs of users, the control system was transformed to achieve the expected goal.