三峡RCC围堰架空式高速胶带输送混凝土系统安装工艺

来源 :水电站机电技术 | 被引量 : 0次 | 上传用户:lifenfeng
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
架空式高速胶带输送混凝土系统是三峡三期工程RCC围堰混凝土施工的重要运输手段.该系统具有空间跨度大、结构型式复杂和特殊地理位置等特点,结合现场施工手段和场地,经过充分的方案研究和优化,选取了适宜现场安装的施工工艺.通过实践证明,该工艺从根本上解决了大型架空式高速胶带输送混凝土系统安装的技术难点,并安全顺利地提前完成了全部的安装工作,为三峡三期工程RCC围堰混凝土预期施工目标奠定了良好的基础.“,”The elevated high-speed conveyer of concrete transport for the RCC cofferdam construction in the third stage of Three Gorges Project was noted for its large span, complex structure and special topographic conditions. According to the construction method and site, the suitable erection technique was chosen after the scheme having been discussed and optimized. The technical difficult points had been solved and the erection task had been completed in advance. This lay a foundation for completing the RCC cofferdam construction in time.
其他文献
参照北京林业大学毛白杨研究所对建国初期的“接炮捻”技术进行改进后运用于当前生产的三倍体毛白杨繁育技术 ,进行了大叶山杨的“接炮捻”自生根的初步试验 ,不但使大叶山杨
三峡水利枢纽左岸厂房工程共布置2台1200t/125t桥式起得机,桥机跨度33.6m,单机自重813t.该桥机是目前世界上单钩起吊最重的桥机,在现场安装过程中,运输、起重吊装工作较为复
本文指出了海洋腐蚀的严重性及发展各种防腐蚀技术的重要性,阐述了海洋腐蚀规律,指出海洋环境下浪花飞溅区腐蚀是钢铁设施腐蚀最为严重的区域,强调了海洋浪花飞溅区保护的重要
针对两江电站机组试运行中出现的问题,对机组结构进行了分析与改造,满足了机组运行要求.
介绍并分析了三峡左岸电站700MW容量的VGS水内冷水轮发电机组定子下线工艺流程、施工工艺方法的特点.阐述了水内冷定子绕组嵌线、槽楔安装、“指”状电接头焊接、水接头配制
该文介绍了水轮发电机组的配重原理及经验公式,并通过实例运用,论述了配重所取得的良好成效.
桥梁在服役过程中会遭受腐蚀介质的侵蚀,而混凝土中钢筋的腐蚀是影响混凝土桥梁耐久性的主要因素之一。同时,为了保持桥梁长期运营的安全性,必须钢筋混凝土进行合理的防护。
三峡水利枢纽二期工程金属结构总重147100t,其中水轮机蜗壳9800t.蜗壳制造厂家分别为ALSTOM和VGS公司,蜗壳除凑合节外均为“C”形节供货,进口最大直径12.4m,板厚28~67mm.现场
本研究通过介绍钢筋混凝土结构的腐蚀因素与腐蚀环境分类,结合国内、外混凝土桥梁结构表面涂层防腐技术标准以及国内的涂装实践,对混凝土表面涂层防腐体系的基本设计原则进行
该文介绍了主轴中心孔补气在乌溪江水电站5号机改造中的应用,减小了机组的压力脉动,使机组的运行状况得到改善,保证了机组稳定运行;该补气方式值得在其他电站推广应用.