论文部分内容阅读
加强土肥水管理夏季刨树盘,耙平后在树盘上覆盖20厘米厚的草或麦秸,其上再压少量土,翌年早春就地翻压。采收后至初冬,采用条沟法施基
Step up soil and fertilizer management summer planing tree plate, rake flat in the tree plate covered with 20 cm thick grass or wheat straw, and then a small amount of soil on the pressure the next year in early spring pressure. After harvesting to early winter, using the ditch method Shi Ji