论文部分内容阅读
纵观全球,人们正在设计、建造越来越多的安装大功率水轮机的水电厂,并陆续投入商业运行。这种现象在南北美洲、俄罗斯和中国尤盛。水轮机的容量最大可达700MW。因此,为确保它们可靠高效地运行,无论是在设计阶段分析有关的重要参数,还是研究水轮机的运行经验,都至关重要。萨扬舒申斯克水电站于1978年12月投入运行,是采用大功率水轮机的典型工程,其经
Throughout the world, people are designing and constructing more and more hydroelectric power plants with high-power turbines and gradually put into commercial operation. This phenomenon in North and South America, Russia and China especially Sheng. Turbine capacity up to 700MW. Therefore, in order to ensure their reliable and efficient operation, it is of crucial importance both in analyzing important parameters during the design phase and in studying the operating experience of the turbine. Savyan Shushenskaya hydropower station was put into operation in December 1978, is a typical project using high-power turbines, the