一、概述“滑—浇”施工工艺简单地说就是墙体采用滑模施工,楼板采用现浇工艺,在滑一层墙身后紧跟着现浇一层楼板,一个楼层的结构由“滑—浇”的施工步骤连续完成,因此楼板与墙身的节点比“滑三浇一”,“滑降结合”等施工方法结合紧密,增强了建筑物的整体性和刚度,有利于提高高层建筑抗震和抗水平力的能力。
I. Overview “slip-pour” construction process is simply the use of sliding mode construction of the wall, the floor slab is cast in place, followed by a layer of floor slab immediately after sliding a wall, and the structure of one floor is “sliding”. The construction step of pouring is completed continuously. Therefore, the joints between the floor and the wall are tighter than the construction methods such as “sliding three-for-one” and “slip-down”, which enhances the integrity and rigidity of the building and helps to increase the seismic resistance of high-rise buildings. Ability to resist horizontal forces.