论文部分内容阅读
柳州阳光100城市广场五星级酒店及裙楼工程总建筑面积45190m~2,主体结构无裂缝缺陷,混凝土表面平整光滑、线条顺直、尺寸准确、棱角方正,观感效果良好,符合设计及规范要求。一万多平方米的隐框玻璃幕墙,结构安装牢固,安全、美观、节能,外墙表面平整,色泽均匀一致,接缝平直,不同材质结合处处理得当,过渡自然美观,外墙四角及造型柱顺直挺拔。该工程施工中以“四节一环保”为目标,倡导绿色施工,外墙装饰施工中应用了大量新材料、新技术、新工艺。
Liuzhou Sunshine 100 City Plaza five-star hotel and podium project total construction area of 45190m ~ 2, the main structure of crack-free defects, smooth and smooth concrete surface, straight lines, accurate size, angular Founder, the perception of good results, in line with the design and specification requirements . More than 10,000 square meters hidden frame glass curtain wall, the structure of the installation of solid, safe, beautiful, energy saving, exterior wall surface smooth, uniform color, seam straight, different material combination properly handle the transition natural and beautiful, Straight upright shape column. In the construction of the project, “four green environmental protection” as the goal, promote green construction, exterior decoration applied a large number of new materials, new technologies, new technology.