多阶段生产计划在钢管制造企业中起着重要的作用,在学术研究中也具有一定的复杂性.由于企业库存与生产及计划密切相关、订单交货期对生产和库存又具有很强的关联性,在研究中将库存的动态性和交货期纳入多阶段生产计划中,试图寻求找到优化的生产计划的方法.根据ERW直缝焊管企业的生产特点,对其生产计划的制订方式进行了优化.针对多阶段生产计划建立了考虑库存和交货期的提前/拖期惩罚数学模型,通过遗传算法对其进行求解及优化,从而得到生产计划的较优解.
Multi-stage production planning plays an important role in steel pipe manufacturing enterprises and also has some complexity in academic research.Because enterprise inventory is closely related to production and planning, order delivery time has a strong correlation with production and inventory In the study, the inventory dynamics and delivery time were included in the multi-stage production plan, trying to find a way to optimize the production plan.According to the production characteristics of the ERW Longitudinal Welded Pipe Enterprise, the production planning was modeled Optimization.For the multi-stage production planning, a mathematic model of advance / tardiness penalty considering inventory and delivery is established, which is solved and optimized by genetic algorithm to get the optimal solution of production plan.