目前国外由于石油涨价、工农业等用电需要量增长、扩建或改建老水电站比新建水电站经济等原因,对现有水电站的现代化(包括革新、挖潜、改建、扩建等)问题已愈来愈重视。国外有不少老水电站已经和正在进行现代化。据美国工程师兵团的调查,美国一些现有的水电站通过扩大装机,可以增加出力1400万瓩,并且在成本上是可以同火电站和原子能电站竞争的。美国垦务局对某些现有水电站作了类似的调查,发现通过扩建和更新设备,可以增加出力150万瓩。
At present, due to such reasons as the increase of oil price, the need of industry and agriculture, the expansion of or replacement of old hydropower stations with that of new hydropower stations, the problems of modernization (including renovation, tapping potential, reconstruction and expansion) of existing hydropower stations have become increasingly serious Pay attention. Many old hydropower stations abroad have been and are undergoing modernization. According to a survey conducted by the Corps of Engineers, some existing hydropower plants in the United States can increase their output by 14 million tons by expanding their installed capacity, and at cost can compete with thermal power stations and nuclear power stations. The Bureau of Reclamation conducted a similar survey of some existing hydropower plants and found that an additional 1.5 million kilowatt-hours could be added by expanding and upgrading equipment.