坝下涵管是水库枢纽工程中的重要组成部分,近年来,在工程实践中,发现不少坝下涵管,由于各种不同的原因而产生裂缝、断裂,直接危及主体工程大坝的安全,因此,不得不将原涵封堵另凿隧洞,或挖开大坝重建新涵,或采取其他补强措施。总之,由此而造成重复投资所付出的代价是相当可观的。其中,不少建筑在软基上的涵管断裂,大都是由于设计时忽略必须考虑的纵向强度计算,而仅以横向强度作为控制条件而引起的。
The culvert under the dam is an important part of the reservoir project. In recent years, it has been found that many culverts under the dam have cracks and fractures due to various reasons, which directly endanger the safety of the main dam. , They had to plug the original culvert into another tunnel or dig out the dam to rebuild the new culvert or take other reinforcement measures. In short, the resulting costs of duplicating investments are considerable. Among them, many of the culvert pipe fractures built on soft foundations are mostly caused by ignoring the design of longitudinal strength which must be considered, but only using lateral strength as the control condition.