在《云南水力发电》1985年第二期上,我对绿水河水轮机导水机构损坏的原因作了初步分析,并提出了让导水叶开大些,也就是适当增加机组出力的办法来减轻导水机构的损坏,这涉及引水系统和一系列机电设备的改造问题,其中有一些确实难以实现,现在提出另一个较为可行的措施,是用一个参数较低的新转轮替换A34转轮。这两个措施采用的方法虽不同,但基本观点是一致的,都是让水轮机经常处于最优工况下运行,增加导叶内侧压力。由于机组的出力、转速、直径、水头、吸出高度及转轮的基本尺寸已不能变,要选择一个理想的新转轮已不可能,只能在这些前提下选一个较好的转轮,适当改善水轮机的
On the second phase of “Yunnan Hydropower” in 1985, I made a preliminary analysis of the causes of damage to the aqueduct of the Lvshui River and put forward some suggestions on how to make the diversion of water diversion larger, that is to say, To mitigate the damage to the water guide mechanism, which involves the transformation of the water diversion system and a series of mechanical and electrical equipment, some of which are indeed difficult to achieve. Another more feasible measure now proposed is to replace the A34 runner with a newer one with a lower parameter . Although the methods adopted by these two measures are different, the basic viewpoints are the same. All of them make the turbine run under the optimal conditions frequently and increase the pressure inside the guide vanes. As the unit output, speed, diameter, head, suction height and the basic dimensions of the wheel can not be changed, to choose an ideal new wheel has been impossible, only under these conditions, choose a better runner, appropriate Improve the turbine