南汇东滩促淤圈围四期、五期工程位于南汇大治河河口两侧滩涂上,圈围大堤总长28.6km,圈围总面积8.6万亩,工程总投资约28.6亿。工程于2003年9月实施,2006年6月竣工。鉴于工程规模大,施工强度高;工程区域风浪大,可作业时间少:促淤区内新建圈围大堤地基处理难;挖泥船取沙设备要求高,施工组织难度大等特点,设计过程中专门委托多家科研单位进行了2项室内物理模型试验和5项专题研究,为工程实施奠定了科学基础。结合工程实际,设计创新如下:
Nanhui East Beach to promote siltation 4, Phase 5 project is located in Nanhui Dazhihe mouth on both sides of the beach, surrounded by a total length of 28.6km dike, encircle the total area of 86,000 mu, the total investment of about 2.86 billion. The project was implemented in September 2003 and completed in June 2006. In view of the large scale of the project and high construction intensity, the stormy area of the project area can be operated for a long time, and the operation time is small: the foundation treatment of the newly built encircle embankment in the silting area is difficult; the requirement of the sand dredging equipment is high and the construction organization is difficult; Specifically entrusted a number of scientific research units carried out two indoor physical model test and five special studies, laying a scientific foundation for the implementation of the project. With engineering practice, design innovation is as follows: