论文部分内容阅读
随着我国经济的不断发展,厂房的建设规模越来越大。公司近几年承接的厂房工程,如无锡海力士厂房建筑面积21万m~2,深圳华星光电8.5代线厂房42万m~2,昆山龙飞光电7.5代厂房68万m~2,合肥鑫盛光电76万m~2,重庆京东方100万m~2,厂房的建筑面积越来越大,反而工期越来越短,传统的测量手段无法完成。重庆京东方第8.5代薄膜晶体管液晶显示屏生产线厂房是中国体量最大、洁净面积最大、功能最全的薄膜晶体管高世代线厂房,在项目施工过程中,测量作业人员创新研究新技术,积极采用新设备,解决了项目快速精密施工的测量难题。仅用390 d就完成了这座建筑面积100万m~2的厂房施工,创造了全球电子厂房建设速度新纪录,被重庆市政府称为“重庆奇迹”。
With the constant development of economy in our country, the scale of plant construction is getting bigger and bigger. In recent years, the company to undertake plant engineering, such as Wuxi Hynix plant construction area of 210,000 m ~ 2, Shenzhen Huaxing Photoelectric 8.5 on behalf of the plant 420,000 m ~ 2, Kunshan Longfei Optoelectronics 7.5 generation plant 680,000 m ~ 2, Hefei Xin Sheng photoelectric 760000 m ~ 2, Chongqing BOE 1000000 m ~ 2, the plant construction area is getting bigger and bigger, but shorter and shorter construction period, the traditional means of measurement can not be completed. Chongqing BOE 8.5th Generation Thin Film Transistor Liquid Crystal Display Production Line The factory is the largest generation of thin film transistor high voltage generation plant in China with the largest volume, the largest clean area and the most complete functions. During the construction of the project, Equipment to solve the project quickly and accurately measuring the construction of the problem. The construction of a plant with a building area of 1 million m 2 was completed in only 390 days, creating a new record for the construction pace of the global electronics factory. The Chongqing Municipal Government called it a “miracle of Chongqing.”