论文部分内容阅读
一九八○年,冶金工业部建筑研究总院单独完成和与有关单位共同完成的重要科研成果中,有37项成果通过了技术鉴定或由同行专家进行评议予以肯定。在通过技术鉴定的成果中,部级鉴定14项,局级鉴定5项。其余18项由中国金属学会冶金建筑学术委员会等学术组织进行了评议,从技术经济上都做了肯定的结论。冶金工业部建筑研究总院同有关单位在宝钢工程建设中,取得了一批科技成果。特别是在软土地基加固方面,继前几年搞了“三桩一降水”(钢管桩、砂桩、钢筋混凝土长桩和深层降水)之后,又搞了
In 1980, among the important scientific research achievements completed by the Building Research Institute of the Ministry of Metallurgical Industry alone and jointly with related organizations, 37 achievements passed technical appraisal or were evaluated by peer experts. Among the results obtained through technical appraisal, 14 were identified by departmental level and 5 by bureau level. The remaining 18 items were reviewed by academic organizations such as the Metallurgical Architecture Academic Committee of the Chinese Metal Society, and they made a definite conclusion on the technical and economic aspects. The Ministry of Metallurgical Industry Construction Research Institute and other relevant units have obtained a number of scientific and technological achievements in the construction of Baosteel. In particular, in terms of strengthening the soft soil foundation, following the “three piles and one precipitation” (steel pipe piles, sand piles, reinforced concrete long piles, and deep precipitation) in previous years, the