某住宅小区内8栋住宅均为地上8层、地下1层的砖混结构。地下室外墙为370mm厚砖墙,外墙防水设计为二布三膏外防水和防水砂浆五层抹面内防水相结合。该住宅施工于1997年10月~1998年8月,地下室防水施工于1997年12月。当该小区竣工交付使用1年后,回访中发现,有一部分地下室因墙体渗漏影响
Eight residential buildings in a residential area are 8 floors above ground, brick structure on the ground floor. Basement wall is 370mm thick brick wall, waterproof exterior wall design for the second three-paste outside the waterproof and waterproof mortar five-layer waterproof surface combination of waterproof. The residential construction in October 1997 ~ August 1998, basement waterproof construction in December 1997. When the district completed the delivery of the use of 1 year after the return visit found that some of the basement due to wall leakage