西江大桥施工监控过程中 ,在长悬臂施工状态下 ,采用相对标高法立模 ,尽量消除温度对立模标高的影响以及在实际工程中取得的效果
In the process of construction monitoring of Xijiang Bridge, under the condition of long cantilever construction, the relative elevation method is adopted to establish the vertical mode, so as to eliminate the influence of the temperature on the oppositional model elevation and the effect achieved in the actual project