80万千瓦机组头三年的运行经验表明,高压加热器可靠性最差的部件是法兰连接的膜式密封件,绝大多数膜式密封的损坏是在高压加热器投运时发生的,而且在很多情况下是在投运初期由保护装置动作切除高压加热器后发生的。因此对高压加热器运行外壳时的温度工况、法兰接合面的变形和连接螺栓的应力进行了专门的研究,并将实测。应力与保证法兰接合面密封性所要求的设计值进行了对比。同对应当指出的是:正如以上所述,既然绝大多数膜式密封的损坏与高压加热器的
The first three years of operating experience of an 800 MW unit has shown that the worst reliability component of a HP heater is a flanged membrane seal and the vast majority of membrane seal damage occurs when the HP heater is in operation. In many cases, occurs after the high-pressure heater is removed by the protective device during the initial operation. Therefore, the operating conditions of the high pressure heater housing temperature, the deformation of the flange joint surface and the stress of connecting bolts were specially studied and will be measured. The stress is compared with the design value required to ensure the sealing of the flange joint. It should be pointed out that, as mentioned above, since the vast majority of membrane seal damage and high pressure heaters