干熄焦大体积混凝土施工,主要是防止混凝土因水泥水化热引起的温度差产生温度应力裂缝,首先要从原材料,混凝土拌制,浇筑以及后期养护,加强混凝土的养护,特别是早期对大体积混凝土表面的保温措施,避免混凝土表面内外温差过大(控制在25℃以内),保证温度平稳下降,确保了大体积混凝土施工质量,但在应用中也存在着一些问题值得探讨和分析,如降温管的铺设技术,混凝土内部温度与外部温度的实际偏差,循环水流量控制,降温水管的选择等,有待今后的工程实践中进一步完善和提高。
CDQ mass concrete construction, mainly to prevent concrete due to temperature difference caused by cement hydration temperature stress cracks, first of all from the raw materials, concrete mixing, pouring and post-curing, and strengthen the conservation of concrete, especially the early large Volume concrete surface insulation measures to avoid the temperature difference between inside and outside the concrete surface is too large (controlled within 25 ℃), to ensure a steady decline in temperature to ensure the mass concrete construction quality, but there are also some problems worth exploring and analysis, such as Cooling pipe laying technology, concrete internal temperature and external temperature of the actual deviation, circulating water flow control, selection of cooling pipes, etc., to be further improved and enhanced in future engineering practice.